Our projects
Projects signed by DPA
Turnkey

Mecon Engineering/Medcem
CO₂ Tank Building
- Date
- Feb 2026-Apr 2026
- Scope
- Construction of a reinforced concrete building for the CO₂ tank and installation of the tank.
Renovation

SF Construction/Medcem
Mill No. 6 Electrical Buildings – Finishing Works
- Date
- April 2026-June 2026
- Scope
- Execution of all masonry, plastering, gypsum plastering, painting, external thermal insulation, tiling and waterproofing works for the elec…
Turnkey

Çimsa Cement
Automation Building Renovation
- Date
- Apr 2026-Jun 2026
- Scope
- All interior and exterior painting works of Automation Building No. 1, replacement of all ceramic tiles and marble, repair of doors and rep…
Turnkey

Medcemport
Precast Warehouse Building
- Date
- August 2025 – November 2025
- Scope
- Construction of a 1,000 m² precast warehouse building at the Medcemport site; all turnkey works.
Reinforced Concrete

Medcem Cement Plant
Underground Clinker Bunker
- Date
- November 2024 – April 2025
- Scope
- Underground reinforced concrete bunker for use as a 1,000 m³ clinker stockyard; all turnkey works.
Turnkey

Medcem
Weighbridge Project
- Date
- August 2025 – October 2025
- Scope
- Turnkey construction of two 80-tonne weighbridge foundations and a reinforced concrete weighbridge cabin.
Turnkey

Çimsa Cement
Smart Room Renovation
- Date
- Feb 2026-Apr 2026
- Scope
- Painting, suspended ceiling, epoxy flooring, aluminium partition and electrical works for the digital system room from which all plant proc…
Renovation

Medcem
CCR Building Renovation
- Date
- August 2025 – September 2025
- Scope
- Complete interior renovation of the central control room (automation) building at Medcem Cement Plant.